The Panama Canal, connecting the Atlantic and Pacific Oceans, is perhaps the most crucial piece of infrastructure supporting the free flow of international trade and goods in the western hemisphere. Vessels passing through the lakes and locks travel approximately 77 km between the entrances of the Atlantic and Pacific Oceans, eliminating the lengthy and often precarious route around Cape Horn in South Africa. The new waterway expansion of the Panama Canal is one of the hardest works ever won by human effort and ingenuity.

Following a host of delays and uncertainties pertaining to the completion of the much anticipated expansion project, the expanded waterway the third set of locks project began commercial operation on June 26, Today, it only takes six to eight hours for vessels to pass through the Panama Canal compared with almost one day before the expansion simply because vessels could not pass side-by-side, and Panamax-sized vessels were prohibited from using the canal at night.

In , the USA took over the operations of the Panama Canal and the Canal Zone surrounding it since its beginnings, and it was not until September 7, that Torrijos—Carter Treaties provided for the transition of control to Panama.

The treaties highly guaranteed that Panama would gain control of the Panama Canal after , ending the sovereignty of the canal that the USA had exercised since Because of its importance and uniqueness in many fields, the ACP is financially autonomous, having ss. The ACP, in coordination with Panama government entities designated by law, is also highly responsible for the management, maintenance, utilization and conservation of the water resources of the canal watershed, including lakes and their tributary streams.

It was one of the largest companies listed on the Hong Kong Stock Exchange. Its businesses also included retailing, property development and infrastructure.

It was The Panama Canal locks are a lock system that lifts a ship up 26 meters to the main elevation of the Panama Canal and down again. The total length of the lock structures, including the approach walls, is over 3 km. The locks, when opened in , were one of the greatest engineering works ever to be undertaken. The Panama Canal comprises 17 artificial lakes including several improved artificial channels and 12 locks.

The locks system is a two-step flight at Miraflores Locks Pacific side , and a single flight at Pedro Miguel lock Pacific side , lifting vessels from the Pacific Ocean up to Gatun Lake Atlantic side ; then a triple flight at Gatun lock lowers them to the Atlantic Ocean[ 3 ]. The lift at Miraflores Locks actually varies due to the extreme tides on the Pacific side, between 13 meters at extreme high tide and 20 meters at extreme low tide.

However, in comparison, tidal differences on the Atlantic side are very small. Of particular note is that all of the above-mentioned three sets of locks are paired, that is, there are two parallel flights of locks at each of the three lock sites. The design successfully allows vessels to traverse in opposite directions simultaneously.

However, large vessels just cannot cross safely at speed in the Culebra Cut. Therefore, in practice, vessels transit in one direction for a time, then in the other, using both lanes of the locks in one direction at a time.

The size of the locks along the passage of the Panama Canal determines the maximum size of vessels being able to traverse the canal. Because of the extreme importance of the canal in terms of international trade and shipping, many vessels are built, then, to the maximum size allowed with an aim to carry more cargoes. However, its actual cargo is restricted to about 52, DWT because of draft restriction in the canal. The ACP and the Panama Government have been positively striving to maintain the waterway as the pivotal route of choice for international trade.

For this, keeping constant contact with shipping companies is vitally important to the future business of the canal. According to statistical data provided by the ACP, there are around 40 per cent of the US-bound cargoes going through either Los Angeles or Long Beach, while 60 per cent of the traffics transiting the Panama Canal beginning or ending its journey at a US port. The competition between ports at US east and west coasts continues. The Panama Canal has seen the rise of annual cargo traffic from approximate 1, vessels transit ocean going commercial traffic since opened in to 12, oceangoing vessels transit in and down to 11, oceangoing vessels transit in Figure 3.

The drop in fiscal year was attributed to the many challenges for the Panama Canal, among them: the delay in the opening date of the new Neo-Panamax locks;. The total cargo through the Panama Canal registered Apart from containers, the principal commodities are grain, chemicals, petroleum products, coal, coke, minerals, metals and phosphates Table I.

According to the statistical data from Canal De Panama Annual Report , apart from the US major users and their percentage of world trade , are Ecuador import The importance of the new expansion project the third set locks project has been highly illustrated by the continuing problem that vessels have been facing in getting swift access to the Panama Canal as demand for its services has been ever increasing.

Vessels waiting to transit the canal have become a regular feature. However, the tolls will be increased around doubling by to cover the expansion expenses. In essence, the new expansion project will increase the locks potential by more than 90 per cent. As demand has been on the rise, the Panama Canal is positioned to be a significant feature of world shipping for the near future.

However, changes in shipping patterns, particularly the increasing numbers of Post-Panamax vessels, will necessitate changes to the canal should she to retain a significant market share.

According to statistical data, about 50 per cent of the transiting vessels were already using the full width of the locks. Undoubtedly, the expansion of third set of locks project is necessary. The project refers to the expansion of the Panama Canal. Completed in June , it is for two new flights of locks to be built parallel to, and operated in addition to, the old locks, one east of the existing Gatun locks Atlantic side and one southwest of the Miraflores Locks Pacific side , each with three chambers.

The new locks will be supported by new approach channels, including a 6. Each of these channels will be meter wide, which can provide Post-Panamax vessels with ample space to navigate the channels in one direction at a time. Each flight will ascend from sea level directly to the level of Gatun Lake; the existing two-stage ascent at Miraflores and Pedro Miguel locks will not be replicated. The new lock chambers are featured with sliding gates, doubled for safety and are meter long, meter wide and This allows the transit of vessels with a beam of from Meanwhile, the Gaillard Cut and the channel through Gatun Lake has been widened to at least meters on the straight portions and at least meters on the bends.

The maximum level of Gatun Lake has been raised from In addition, deepening the Culeba Cut has also been incorporated. This enables larger vessels than ever before to pass this waterway. Each flights of locks are accompanied by nine water reutilization basins three per lock chamber , each basin being about meter wide, meter long and 5.

These gravity-fed basins allow 60 per cent of the water used in each transit to be reused; the new locks consequently use 7 per cent less water per transit than each of the existing lock lanes. The deepening of Gatun Lake and the raising of its maximum water level provide capacity for significantly more water storage. These measures are intended to allow the expanded canal to operate without constructing new reservoirs. The new expansion project reached its 8 per cent completion in September , constituting a paradigm shift for world trading, particularly for Panama and the main users of the canal, including China, the USA, Chile and Ecuador.

Vessels take two hours to transit the new locks, meaning a maximum of 12 transits per day, on top of the plus transits already being done, though some of these may transfer to the new locks. Happy holidays Suzi. When I was working on the Panama Canal a measurement ton of cubic feet was the way ships paid for their transit.

Volume, not weight, was the source of payment in those days. I am going to sail to florida via the canal. Do i need a pilot to take my 33ft Morgan Islander though the canal. The experience i have had with sherpas when i climbed Mt Everest was a disaster.

I was told this is true for the Panama canal crossi g as well with the Panama canal pilots too. I am looking for information on reputable compaies that i can pay to pilot my sailboat through the canal. Hi JuliaMarie, I am by no means an expert on this, but my understanding is that yes, you most definitely do have to use a canal pilot to transit the canal. Everything from a small sailboat to a 12, TEU container ship must transit the canal with a pilot.

However I do not believe that there are companies you contract for this. It is part of the fee that you pay to transit the canal, and the canal authority provides you with the pilot. But my understanding is that this is all part of your canal toll.

Posted in When You Travel. I enjoyed this article. Thank you for sharing your knowledge. Truly Diana. Leave a Reply Cancel reply Your email address will not be published. Comment Name Email Website. The container ship was the first vessel to travel through the expanded Panama Canal.

Today, roughly 18 months later, more than 2, Neo-Panamax have undertaken the same journey. This expansion project has opened up a new shipping lane for larger, Neo-Panamax vessels. The construction of two new sets of locks on the Pacific and the Atlantic sides of the canal was by far the most important component of the expansion. Increasing the size of vessels able to pass through, from a maximum length of metres and a beam of Initially, traffic at the new locks was slow.

This is because the procedure for guiding ships through, has changed significantly. In May , the Canal Authority noted that this number had increased to an average of 5. In December the number of locks has been increased from 6 to 7 to meet the increasing demand, while container ships will have preference over other ship types when allocating the additional slots.

So far, container ships and LPG carriers have been the segments that have made the most of the new locks, logging 1, and transits respectively as per November And even though they made fewer transits than container vessels, Neo-Panamax LPG carriers have felt the impact of the new waterway the most.

Operators interested in rerouting their services need to take several factors into consideration before booking a slot for an existing Post-Panamax ship. One of the biggest adjustments concerns the mooring equipment.

All chocks and bollards, which are used for the towing operation, need to withstand a safe working load of 90 tonnes, since the tugboats manoeuvre the vessel with greater force than the locomotives would.